Search another route:           

Travel information for US Highway 189 is as follows:

Last update at: May 6, 2025, 04:29 AM

New Feature


Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 3 (Southwest) WY22: Weight limit of 60,000 GVW is in effect over Teton Pass between milepost 7 and the Idaho State Line.

Green River Tunnel Media Kit

I80: Green River tunnel Eastbound lane, head to head traffic at milepost 90, speed limit 35 mph, legal width only. Oversized vehicles should contact WYDOT’s oversize loads permit office for detours. Info at https://whp.wyo.gov/commercial-carrier/ports-of-entry



Conditions
Route Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Wet with Rain None None May 6, 2025, 04:29 AM    
Between Evanston and I-80 Exit 18 Wet with Rain, Dangerous Winds Extreme Blow Over Risk
Closed to all high profile vehicles under 20000 GVW due to extreme blowover risk. All campers under 20,000 LBS are restricted.
May 6, 2025, 04:29 AM    
Between I-80 and WY 412 Wet with Rain None None May 6, 2025, 04:29 AM    
Kemmerer
NWS Forecast
Between WY 412 and Kemmerer Dry None None May 6, 2025, 04:29 AM    
Between Kemmerer and WY 372 Dry None None May 6, 2025, 04:29 AM    
La Barge
NWS Forecast
Between WY 372 and La Barge Dry None None May 6, 2025, 04:29 AM    
Between La Barge and Big Piney Dry None US 189 at milepost 104.840
Single unit 6+ axles: 34T
May 6, 2025, 04:29 AM    
Pinedale
NWS Forecast
Between Big Piney and Daniel Jct Dry None None May 6, 2025, 04:29 AM    
Between Daniel Jct and Bondurant Dry None None May 6, 2025, 04:29 AM    
Jackson
NWS Forecast
Between Bondurant and Hoback Jct Wet with Rain Falling Rock None May 6, 2025, 04:29 AM    
Between Hoback Jct and Jackson Wet with Rain None Width restriction: 15 ft
Height restriction: 15 ft
Length restriction: 90 ft
May 6, 2025, 04:29 AM    

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
D3 Bridge Rehab US 191 mp 153; US 189 mp 130 and WY 353 mp 6.7 near Pinedale B243037 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
Mar 3, 2025 Oct 30, 2025 Bridge rehabilitation involving structures, traffic control asphalt paving, guardrail and seeding/erosion control at various locations. Expect one lane road with traffic signals in place. 153.700 to 153.800 Paved 10 minute delays with stopped conditions Mar 17, 2025, 04:27 AM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.