Work-for-WYDOT.png
Search another route:           

Travel information for US Highway 189 is as follows:

New Feature


Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 3 (Southwest) WY22: Weight limit of 60,000 GVW is in effect over Teton Pass between Jackson and the Idaho state line from milepost 7 to 17.

I80: The Bitter Creek Rest Area is closed until further notice EASTBOUND near Patrick Draw at milepost 144.2.



Conditions
Route Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None None Jun 15, 2026, 04:10 PM   Evanston POE Evanston Bear River Dr   Evanston POE Evanston Bear River Dr
Between Evanston and I-80 Exit 18 Dry None None Jun 15, 2026, 04:10 PM   Bear River Dr First Divide US 189 Interchange   Bear River Dr Painter First Divide US 189 Interchange
Between I-80 and WY 412 Dry None None Jun 15, 2026, 04:10 PM   US 189 Interchange Lincoln / Uinta County Line   US 189 Interchange
Kemmerer
NWS Forecast
Between WY 412 and Kemmerer Dry None None Jun 15, 2026, 04:10 PM   Lincoln / Uinta County Line  
Between Kemmerer and WY 372 Dry None None Jun 15, 2026, 04:10 PM   US189/WYO240 Junction  
La Barge
NWS Forecast
Between WY 372 and La Barge Dry None None Jun 15, 2026, 04:10 PM    
Between La Barge and Big Piney Dry None US 189 at milepost 104.840
Single unit 6+ axles: 34T
Jun 15, 2026, 04:10 PM    
Pinedale
NWS Forecast
Between Big Piney and Daniel Jct Dry None US 189 from milepost 129.600 to 129.620
Width restriction: 14 ft
Jun 15, 2026, 04:10 PM   Marbleton North  
Between Daniel Jct and Bondurant Dry None None Jun 15, 2026, 04:10 PM   Warren Bridge Hoback Rim Bondurant   Warren Bridge
Jackson
NWS Forecast
Between Bondurant and Hoback Jct Dry Falling Rock None Jun 15, 2026, 04:10 PM    
Between Hoback Jct and Jackson Dry None US 189/US 191/US 26/US 89/W BROADWAY AVE from milepost 152.090 to 155.210
Width restriction: 15 ft
Height restriction: 15 ft
Length restriction: 90 ft
Jun 15, 2026, 04:10 PM   Hoback Junction US 89 / WYO 22 Junction  

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Bridge Rehab near Afton and Pinedale US 189 mp 129;US 89 mp 95, mp 72, and mp 118; WY 354 mp 1.26 SCP-TC-B233007 & ARSCT-B233A02 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
May 18, 2025 Sep 30, 2026 Bridge Rehabilitation involving structures, traffic control, asphalt paving, and seeding/erosion control work at various locations in Transportation District 3. Expect at traffic signal in place with width restrictions.

US191

WBROADWAYAVE

US26

WASHINGTONST

US189

US89

US287

118 to 118.1 Paved Expect delays Jun 8, 2026, 07:16 AM
Bridge Rehab near Afton and Pinedale US 189 mp 129;US 89 mp 95, mp 72, and mp 118; WY 354 mp 1.26 SCP-TC-B233007 & ARSCT-B233A02 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
May 18, 2025 Sep 30, 2026 Bridge Rehabilitation involving structures, traffic control, asphalt paving, and seeding/erosion control work at various locations in Transportation District 3. Expect at traffic signal in place with width restrictions.

US191

US287

WBROADWAYAVE

US89

WASHINGTONST

US189

US26

72.1 to 72.2 Paved Expect delays Jun 8, 2026, 07:16 AM
Bridge Rehab near Afton and Pinedale US 189 mp 129;US 89 mp 95, mp 72, and mp 118; WY 354 mp 1.26 SCP-TC-B233007 & ARSCT-B233A02 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
May 18, 2025 Sep 30, 2026 Bridge Rehabilitation involving structures, traffic control, asphalt paving, and seeding/erosion control work at various locations in Transportation District 3. Expect at traffic signal in place with width restrictions.

WASHINGTONST

WBROADWAYAVE

US89

US26

US191

US287

US189

95 to 95.15 Paved Expect delays Jun 8, 2026, 07:16 AM
Bridge Rehab near Afton and Pinedale US 189 mp 129;US 89 mp 95, mp 72, and mp 118; WY 354 mp 1.26 SCP-TC-B233007 & ARSCT-B233A02 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
May 18, 2025 Sep 30, 2026 Bridge Rehabilitation involving structures, traffic control, asphalt paving, and seeding/erosion control work at various locations in Transportation District 3. Expect at traffic signal in place with width restrictions.

US189

ELKST

US191

129.7 to 129.8 Paved Expect delays Jun 8, 2026, 07:16 AM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.