Travel information for US Highway 189 is as follows:

Last update at: Aug 25, 2025, 01:05 PM

New Feature


Frequently Asked Questions Closures & Advisories
Search Conditions By Map
Search By City
Search By District
Variable Speed Limits
Chain Law
Neighboring States

District Comments
District 3 (Southwest) WY22: Weight limit of 60,000 GVW is in effect over Teton Pass between milepost 7 and the Idaho State Line.

Green River Tunnel Media Kit

I80: Green River tunnel Eastbound lane, head to head traffic at milepost 90, speed limit 35 mph, legal width only.

I80: Bitter Creek Rest Area is closed until further notice WESTBOUND near Patrick Draw at milepost 143.5.



Conditions
Route Location Conditions Advisories Restrictions Last Report Time Cameras Sensors
Evanston
NWS Forecast
Between the Utah State Line and Evanston Dry None None Aug 25, 2025, 01:05 PM    
EASTBOUND between Evanston and I-80 Exit 18 Dry None I 80/US 189 from milepost 9.250 to 11.000
Width restriction: 12 ft 0 in
I 80/US 189 from milepost 14.250 to 16.000
Width restriction: 12 ft 0 in
Aug 25, 2025, 01:05 PM    
WESTBOUND between Evanston and I-80 Exit 18 Dry None None Aug 25, 2025, 01:05 PM    
Between I-80 and WY 412 Dry None None Aug 25, 2025, 10:33 AM    
Kemmerer
NWS Forecast
Between WY 412 and Kemmerer Dry None None Aug 25, 2025, 10:33 AM    
Between Kemmerer and WY 372 Dry None None Aug 25, 2025, 10:33 AM    
La Barge
NWS Forecast
Between WY 372 and La Barge Dry None None Aug 25, 2025, 10:33 AM    
Between La Barge and Big Piney Dry None US 189 at milepost 104.840
Single unit 6+ axles: 34T
Aug 25, 2025, 10:33 AM    
Pinedale
NWS Forecast
Between Big Piney and Daniel Jct Dry None US 189 from milepost 129.710 to 129.730
Width restriction: 16 ft
Height restriction: 14 ft
Aug 25, 2025, 10:33 AM    
Between Daniel Jct and Bondurant Dry None None Aug 25, 2025, 10:33 AM    
Jackson
NWS Forecast
Between Bondurant and Hoback Jct Dry Falling Rock US 189/US 191 from milepost 153.760 to 153.850
Width restriction: 12 ft
Height restriction: 14 ft
Aug 25, 2025, 10:33 AM    
Between Hoback Jct and Jackson Dry None Width restriction: 15 ft
Height restriction: 15 ft
Length restriction: 90 ft
Aug 25, 2025, 10:33 AM    

Construction Projects
Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
D3 Bridge Rehab US 191 mp 153; US 189 mp 130 and WY 353 mp 6.7 near Pinedale B243037 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
Mar 3, 2025 Oct 30, 2025 Bridge rehabilitation involving structures, traffic control asphalt paving, guardrail and seeding/erosion control at various locations. Expect one lane road with traffic signals in place. 153.700 to 153.800 Paved 10 minute delays with stopped conditions Mar 17, 2025, 04:27 AM
Bridge Rehab near Afton and Pinedale US 189 mp 129;US 89 mp 95, mp 72, and mp 118; WY 354 mp 1.26 SCP-TC-B233007 & ARSCT-B233A02 Darrin Robinson
307-248-0476
Reiman Corp. and Subsidiary
Cheyenne , WY
307-632-8971
May 18, 2025 Sep 29, 2025 Bridge Rehabilitation involving structures, traffic control, asphalt paving, and seeding/erosion control work at various locations in Transportation District 3. Expect at traffic signal in place with width restrictions. 129.700 to 129.800 Paved Expect delays Jun 16, 2025, 05:28 AM
District 3 Slab Replacement (Diamondville) STP-PM-B253035 Brad McCullough
352-3036(c) 522-8948
None Jul 27, 2025 Oct 30, 2025 Replacement of concrete slabs in Diamondville. The roadway will be open during the duration of construction but traffic will be reduced down to two lanes of traffic. 35.000 to 36.000 Paved 10 minute delays Jul 30, 2025, 02:51 AM
Road work near Evanston I-80 MM 9.25 - 11, 14.25 - 16 EASTBOUND Road work Brad McCullough
352-3036(c) 522-8948
None Jul 15, 2025 Oct 30, 2025 Rehabilitation of eastbound structure on I-80 at MP 10.68. The roadway will have a 12 foot width restriction throughout the duration of construction. Rehabilitation of eastbound structure on I-80 at MP 15.64. The roadway will have a 12 foot width restriction throughout the duration of construction. 14.250 to 16.000 Paved Construction zone speed limit 45 MPH Jul 25, 2025, 04:31 AM
*Chain Law - Level 1 Definition
**Chain Law - Level 2 Definition
Other Definitions

Impact Levels Description / Recommended Action
Low Minimal impacts expected, use general caution.
Moderate Some impacts expected, use extra caution. Stay alert for changing road and weather conditions.
High Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time.
CLOSED Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment.
Seasonal / Long-Duration Event Impact level used to distinguish long-duration events from emergent events.
All travelers are encouraged to check present conditions and forecasts before departing.