I80: Ft. Steele Rest Area CLOSED between Rawlins and Walcott Jct at milepost 228. Motorists still have access to facilities in neighboring communities.
|
District 2 (Central) |
I25: Bridge damage, Right lane blocked NORTHBOUND near Wheatland at milepost 92, Proceed with caution. WY257: Stalled vehicle, Right lane blocked near Casper at milepost 1, Expect delays.
|
District 4 (Northeast) |
US14: Crash, Travel lane blocked near Gillette at milepost 88, Be prepared to stop, expect delays.
|
Conditions | |||||||
---|---|---|---|---|---|---|---|
Nearest Town | Location | Conditions | Advisories | Restrictions | Last Report Time | Cameras | Sensors |
Cheyenne
NWS Forecast |
Between the Colorado State Line and Cheyenne | Dry | None | Sep 26, 2023 12:41 pm |
![]() ![]() ![]() ![]() |
![]() |
|
Between Cheyenne and Exit 29, Whitaker Rd | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() |
||
Chugwater
NWS Forecast |
Between Exit 29, Whitaker Rd and Chugwater | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() ![]() |
|
Between Chugwater and Exit 73, WY 34 | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() |
||
Wheatland
NWS Forecast |
Between Exit 73, WY 34 and Wheatland | Dry | None | Sep 26, 2023 01:40 pm |
![]() |
![]() |
|
NORTHBOUND between Wheatland and Exit 92, US 26 | Dry | None |
I 25 , US 87 from milepost 92 to 92.5 Width restriction: 12 ft |
Sep 26, 2023 01:40 pm |
![]() |
||
SOUTHBOUND between Wheatland and Exit 92, US 26 | Dry | None | Sep 26, 2023 01:40 pm | ||||
Glendo
NWS Forecast |
Between Exit 92, US 26 and Glendo | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() |
|
Between Glendo and Exit 126, US 18/20 | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() |
||
Douglas
NWS Forecast |
Between Exit 126, US 18/20 and Douglas | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
||
NORTHBOUND between Douglas and Glenrock | Dry | None |
I 25 , US 20 , US 26 , US 87 from milepost 160.6 to 161 Width restriction: 11 ft I 25 from milepost 163 to 165.82 Width restriction: 12 ft I 25 from milepost 165 to 177 Width restriction: 14 ft |
Sep 26, 2023 01:40 pm | |||
SOUTHBOUND between Douglas and Glenrock | Dry | None |
I 25 from milepost 165 to 177 Width restriction: 16 ft |
Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() ![]() |
|
Casper
NWS Forecast |
NORTHBOUND between Glenrock and Casper | Dry | None |
I 25 from milepost 165 to 177 Width restriction: 14 ft I 25 from milepost 174 to 175 Width restriction: 12 ft |
Sep 26, 2023 01:40 pm |
![]() |
|
SOUTHBOUND between Glenrock and Casper | Dry | None |
I 25 from milepost 165 to 177 Width restriction: 16 ft I 25 from milepost 174 to 175 Width restriction: 12 ft |
Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() ![]() |
|
Between Casper and Exit 210, Horse Ranch Creek Rd | Dry | None |
I 25 , US 20 , US 26 , US 87 from milepost 187.53 to 189.51 Width restriction: 12 ft I 25 / US 87 at milepost 191.64 Single unit 6+ axles: 36T |
Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() ![]() |
|
Midwest
NWS Forecast |
Between Exit 210, Horse Ranch Creek Rd and Exit 227, WY 387 | Dry | None |
I 25 , US 87 at milepost 222.23 Width restriction: 12 ft I 25 , US 87 at milepost 226.09 Width restriction: 12 ft |
Sep 26, 2023 01:40 pm |
![]() |
![]() |
Between Exit 227, WY 387 and Exit 235, Tisdale Mtn Rd | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() ![]() |
||
Kaycee
NWS Forecast |
Between Exit 235, Tisdale Mtn Rd and Kaycee | Dry | None |
I 25 , US 87 from milepost 253.75 to 254.25 Width restriction: 17 ft |
Sep 26, 2023 01:40 pm |
![]() |
![]() |
Between Kaycee and Mile Marker 272 | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() |
![]() |
||
Buffalo
NWS Forecast |
Between Mile Marker 272 and Buffalo | Dry | None | Sep 26, 2023 01:40 pm |
![]() ![]() ![]() |
![]() |
Construction Projects | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Project Name | Project Number | WYDOT Contact | Contractor Contact | Start Date | Completion Date | Description | Town(s) | Milepost(s) | Surface | Delays | Last Updated |
Roadwork I-25 milepost 271-281 both directions between Kaycee and Buffalo | NHPPI-I255117 |
Stephan Charles 307-425-6605 |
Riverside Contracting, Inc. Missoula, MT 406-721-9267 |
2023-Jan-30 | 2024-Jun-30 | Bituminous surfacing, traffic control, grading, surfacing, milling, structure rehabilitation, drainage, and miscellaneous work. Single lane head-to-head traffic separated by orange traffic control devices. Reduced speed limit through work zone. Width restriction: 14 ft. | 271 to 281 | Paved | None | Jul 13, 2023 04:44 pm | |
Roadwork I-25 Glenrock Marginal mp 160 - 175 both directions | I253116 |
Kevin Hoff 307-258-3064 |
Knife River Cheyenne, WY 307-634-5455 |
2022-Sep-13 | 2023-Oct-31 | Milling, paving, bridge work. I-25 is down to a single lane NORTHBOUND from milepost 167 to 175. | 160.01 to 175.1 | Paved | Expect delays | Sep 25, 2023 01:17 pm | |
Roadwork Casper Marginal - I-25 over Walsh Dr mp 185-186 both directions | I254160 |
Kevin Hoff 307-258-3064 |
Ames Construction, Inc. Burnsville, MN 952-435-7106 |
2021-Jul-08 | 2023-Sep-30 | Grading, bituminous pavement surfacing, concrete pavement bridge replacement and miscellaneous work. Northbound and Southbound traffic is being detoured. Minimal delays expected. | 185.35 to 186.04 | Paved | None | Sep 02, 2023 06:25 pm | |
185.35 to 186.04 | Paved | None | Sep 02, 2023 06:25 pm | ||||||||
District 1 Guardrail Replacement I-25 MP 7-18, US287 MP 409.5, WY13 MP 2-14.5 | B231014 |
Jake Lonn 307-328-4103 |
S&L Industrial Cowley, WY |
2023-Jul-24 | 2023-Oct-31 | Guardrail, traffic control, grading and miscellaneous work at various locations in District 1 | 7 to 18 | Paved |
15 minute delays 15 minute delays |
Jul 21, 2023 06:35 pm | |
7 to 18 | Paved |
15 minute delays 15 minute delays |
Jul 21, 2023 06:35 pm | ||||||||
Bridge Rehab I-25 mp 9 both directions near Cheyenne | STP-BR_B221021 |
Wayne Shenefelt 307-630-8462 |
S & S Builders, LLC Gillette, WY 307-686-5659 |
2023-Apr-03 | 2023-Sep-30 | Bridge Rehabilitation, traffic control, grading and miscellaneous work. Northbound and Southbound lanes will be limited to one lane with a 12 foot width restriction. | 9.14 to 9.14 | Paved | Expect delays | Sep 23, 2023 09:54 am | |
D2 Bridge Rehab I-25 MP 253.96 | B232001 |
Tim Rasnake 307-331-3144 tim.rasnake@wyo.gov |
S & S Builders, LLC Gillette, WY 307-686-5659 |
2023-Sep-21 | 2024-Jul-31 | Bridge Rehabilitation | 253.96 to 254 | Paved | 20 minute delays with stopped conditions | Sep 22, 2023 04:58 pm | |
Wildlife-Fencing near Kaycee I-25 mp 253-268 both directions | STP-WL22102 |
Philip Griffin |
2023-Apr-10 | 2023-Nov-30 | Fencing, Grading, and Miscellaneous work | 253.67 to 268.64 | Paved | Expect delays | Jun 21, 2023 11:37 am | ||
Roadwork I-25 Casper -Kaycee mp 219-227 both directions | I254168 |
Phillip Giffin 307-473-3225 |
2023-Apr-10 | 2024-Jun-30 | Bituminous surfacing, grading, traffic control, surfacing, structure and miscellaneous work on approximately 8.10 miles on NBL and SBL of I-25 beginning at RM 219.00 between Casper and Kaycee. Single lane traffic, reduced speed to 65 MPH, 45 MPH at bridge repair areas. | 219 to 227.12 | Paved | None | Jul 13, 2023 04:42 pm | ||
Bridge Rehab I-25 mp 138 - 142 both directions near Douglas | B222016 B222034 B222012 |
Mark Nelson 307-258-6875 |
S & S Builders, LLC Gillette, WY 307-686-5659 |
2023-Apr-10 | 2023-Dec-31 | Bridge rehab, grading, surfacing, guardrail upgrades, pipe and box culvert extensions. One lane North and South bound traffic until April 24, then will be utilizing crossovers to Southbound lanes only with head-to-head traffic and a 12 foot width restriction. | 138 to 142 | Paved | Construction zone speed limit 65 MPH | Jun 17, 2023 10:34 am | |
Bridge Rehabilitation Casper Marginal I-25 mp 188-189 both directions | T254161 |
Kevin Hoff 307-258-3064 |
Ames Construction, Inc. Burnsville, MN 952-435-7106 |
2023-Jun-06 | 2025-Nov-30 | Bridge and Concrete Work. Exit 188 B I-25 NB is CLOSED. For access to area businesses, Center Street and Downtown, use exit 187 (McKinley Street). | 188.01 to 188.934 | Paved | Construction zone speed limit 45 MPH | Jul 12, 2023 09:45 am |
*Chain Law - Level 1 Definition |
**Chain Law - Level 2 Definition |
Other Definitions |
Impact Levels | Description / Recommended Action |
---|---|
Low | Minimal impacts expected, use general caution. |
Moderate | Some impacts expected, use extra caution. Stay alert for changing road and weather conditions. |
High | Dangerous impacts expected, use extreme caution, delay travel or consider alternate route. If travel is necessary, slow down and allow extra time. |
CLOSED | Per W.S. 24-1-109, motorists traveling on a closed road without permission from WYDOT or WHP may be subject to a fine of up to $750 and/or up to 30 days imprisonment. |
Seasonal / Long-Duration Event | Impact level used to distinguish long-duration events from emergent events. |
|
Contact Us | Copyright 2021 | Disclaimer | Privacy Policy | Media |