Construction Projects

District Comments
District 1 (Southeast)  
District 2 (Central)  
District 3 (Southwest) US30: Watch for falling rocks near Kemmerer from milepost 36 to 38.5.

US89: Watch for wildlife between Moose and Moran Junction from milepost 166 to 184, Proceed with caution.

US189: Watch for wildlife between La Barge and Pinedale from milepost 105 to 131, Proceed with caution.

US30: Watch for wildlife between Kemmerer and Opal from milepost 55 to 75.

WY 22: WEIGHT LIMIT of 60,000 GVWR in effect between Wilson and the Idaho state line, over Teton Pass, from milepost 7 to 17.

I80: Road damage, Right lane blocked EASTBOUND near Patrick Draw at milepost 152, Proceed with caution.

 

District 4 (Northeast)  
District 5 (Northwest)  

Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Snake River North N104083 Bob Hammond
307-732-9602
Wadsworth Brothers Construction Co.
Draper, UT
801-576-1453
2018-May-22 2019-Jun-30 Grading, draining, milling plant mix, removal and replacement of structures, concrete box culverts, placing crushed base and bituminous pavement surfacing, plant mix wearing course, electrical and sewer systems, and miscellaneous work. Paved road. Narrow road over the Snake River Bridge. No delays. US189/US191/US26/US89 144.99 to 148.7 Paved None Nov 15, 2018 08:43 am
Casper Streets (Poplar St. Bridge Over BNSF) (WY220) NHPP-N212118 Chad Aagard
473-3225
chad.aagard@wyo.gov
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2018-Mar-19 2019-Jun-30 Bridge Reconstruction on Poplar Street (WY220), just North of 1st Street, West of Downtown Casper. Traffic will be reduced to one lane in each direction(the two outer lanes across the bridge over the BNSF railroad tracks). Throughout this project, traffic from 1st Street north will remain reduced to one lane, either direction. This is likely to cause severe congestion. Alternate routes are suggested such as Salt Creek Highway. At this time traffic lanes will be 10 feet wide. WY220 116.5 to 116.5 Paved Construction zone speed limit 45 MPH
Various delay conditions
Mar 14, 2018 10:11 am
North Federal Boulevard (US26/WY789) 1 Robert Scheidemantel
307-856-1341
robert.scheidemantel@wyo.gov
S & S Builders, LLC
Gillette, WY
307-686-5659
2018-Mar-19 2019-Oct-31 Road work between Sunset Blvd. and MP106.61 on WY789 from MP 105.75 to 106.61. S&S Builders will close Webbwood Road on the East side of Federal Blvd on March 19th to remove asphalt and concrete. There is an 11 foot width restriction in place for all oversized loads. There is a speed reduction from 30 mph to 20 mph. Single lane travel in Both directions, WY 789 has been reduced from five lanes to two lanes. WY789 105.09 to 106.61 Paved Construction zone speed limit 30 MPH
Reduced speeds up to 20 MPH
Apr 02, 2019 09:03 am
Douglas-Glenrock (Douglas West, West Section SBL) I253114 Jim Barnes
331-1535
james.barnes@wyo.gov
Oftedal Construction, Inc.
Miles City, MT
406-232-5911
2018-Mar-01 2019-Jun-30 Road work on I-25 between Douglas and Glenrock MP 145.5-150. The south bound lane is now open to unrestricted traffic. The width restriction has been lifted. I25/US20/US26/US87 145.5 to 150 Paved, Milled Construction zone speed limit 65 MPH Apr 22, 2019 07:46 am
Newcastle US 16 mp 247.3 - 250.2 PND416 Jack Scribner
307-629-0270
  2018-Mar-27 2019-Oct-31 Road work on US 16 between mp 247.3 and mp 250.2. Demolition began at the Intersection of US 16 (mp 249.5 ) and US 85 (mp 229.5). Speed has been reduced from 30 MPH to 20 MPH through the work zone. Detour is required for US 85 North traffic. Detour is on Elk Mountain Dr. and Howell St. Expect possible delays in this work zone. US16 248.99 to 250.2 Paved, Gravel Construction zone speed limit 20 MPH
Various delay conditions
Apr 02, 2019 08:49 am
Lamont South N211060 Jack Stone
307-473-3227
jack.stone@wyo.gov
Knife River
Cheyenne, WY
307-634-5455
2018-May-29 2019-Jun-30 US287/789 between mileposts 22.97 & 32.99: Grading, draining, crushed base, plant mix overlay, chip seal, bridge rehabilitation, guardrail and miscellaneous work. Expect 20 minute delays. 12 foot width restriction is in place. US287/WY789 22.97 to 32.99 Paved 20 minute delays Jul 10, 2018 11:47 am
Newcastle US 85 mp 228.5 - 231.5 Newcastle US 85 mp 228.5 - 231.5 Jack Scribner
307-629-0270
  2018-Jun-07 2019-Oct-31 Grading, milling, placing bituminous pavement, miscellaneous work on US 85 between milepost 228.5 - 231.5. 12 foot width restriction in place. Newcastle Marginal will be shutdown from July 27, 2018 thru August 12, 2018 and be opened up to unrestricted traffic during the Sturgis Motorcycle Rally. All work at the intersection of US 16 and US 85 has been completed. US85 228.5 to 231.5 Paved, Gravel None Apr 02, 2019 08:50 am
Lusk-Van Tassell (East Section) N403008 Jim Barnes
331-1535
james.barnes@wyo.gov
Knife River
Cheyenne, WY
307-634-5455
2018-Jun-04 2019-Oct-31 Grading, draining, milling, placing surfacing, bridge rehabilitation and bridge replacement, and miscellaneous work on approximately 8.5 miles of US 20 beginning at MP 54.80 between Lusk and Nebraska state line. Paving on the project is complete. There is a short detour at R.M. 61 for the bridge replacement with speeds reduced to 30 M.P.H. A 12' width restriction is in place at the detour location. US20 54.8 to 63.24 Paved, Dirt, Milled Construction zone speed limit 30 MPH
Various delay conditions
Nov 26, 2018 09:53 am
Manderson - Hyattville WY31 0201017 Jordan Erz

jordan. erz@wyo.gov
Mountain Construction Company
Lovell, WY
307-548-7186
2019-Apr-01 2019-Aug-31 Small shoulder widening, pipe extension, leveling and overlay roadwork from milepost 19.20 to 22.09. There are flaggers in place. Be cautious of narrowing roadways and workers. WY31 19.2 to 22.09 Paved Construction zone speed limit 45 MPH Apr 10, 2019 08:14 pm
District 1 Bridge Rehab NHPPI-BR-B181011 Kory Cramer
307-745-2137
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2018-May-14 2019-Sep-30 Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, concrete slab replacement, bridge rehabilitations and miscellaneous work at various locations in Transportation District 1 located on I-80 Eastbound and Westbound between mileposts 258.95 and 267.19. Traffic has been diverted onto the ramps at the Wagonhound interchange. No delays are expected I80 258.95 to 267.19 Paved None Oct 28, 2018 05:45 am
Blue Sky Highway WY 132 1 Erik Smith
307-332-4151
erik.smith@wyo.gov
High Country Construction, Inc.
Lander, WY
307-332-4933
2018-Jul-30 2019-Oct-31 Between intersection of US 287 and Ethete along Blue Sky HWY, WY 132, shoulder grading, truck, and heavy equipment traffic along shoulders of highway and roadway. One lane road in work zones. Minor traffic delays and areas of reduced speeds. Mostly paved surface with areas of gravel surface. WY132 0 to 7 Paved Various delay conditions Apr 02, 2019 09:02 am
Horse Creek Road (Lodgepole Creek Section) 0211007 Kevin Erickson
3076318322
kevin.erickson@wyo.gov
Knife River
Cheyenne, WY
307-634-5455
2018-Sep-05 2019-Oct-31 Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, chip seal and miscellaneous work on approximately 9.00 miles on WYO 211 beginning at RM 8.32. Knife River will be onsite doing shoulder work starting 4/1/19. No impact to normal traffic flow is expected. WY211 8.32 to 17.32 Paved None Apr 15, 2019 06:39 am
Casper Traffic Signals N212120 Jack Stone
307-473-3227
jack.stone@wyo.gov
Hedquist Construction Inc.
Casper, WY
307-237-8543
2018-Nov-26 2019-Aug-31 Grading, milling concrete, placing crushed base and bituminus pavement surfacing, plant mix wearing course, removal and replacement of sidewalk, curb and gutter, electrical and miscellaneous work. Individual intersections include Poplar St & Collins Dr and WY Blvd (258) and 13th St. Intermittent lane closures through the month of April at both intersections. Additional lane restrictions beginning approximately May 1 WY220 115.76 to 115.76 Paved None Apr 23, 2019 11:09 am
WY258 8.86 to 8.86 Paved None Apr 23, 2019 11:09 am
District 3 Bridge Rehab NHPP-B183102 Peter Stinchcomb
307-352-3036
DeBernardi Construction Company, Inc.
Rock Springs, WY
307-382-8034
2019-Mar-25 2019-Oct-31 Driving lane through the structure located at approximate mile marker 104 on I-80 westbound is closed. Traffic is directed around work in the passing lane with a 14 ft width restriction and 45 MPH speeds. I80/US30 104.5 to 105 Paved Construction zone speed limit 45 MPH Apr 08, 2019 02:56 pm
Rock Springs Streets HSIP-B183016 Peter Stinchcomb
307-352-3036
Casper Electric, Inc.
Casper, WY
307-237-3003
2019-Mar-25 2019-Oct-31 Grading, draining, sidewalk, curb and gutter, electrical and miscellaneous work at various locations in the Town of Rock Springs on Business I-80 Dewar Drive, South Side Belt Route, Grant Street & North Center Street, Elk Street, and Bridger Avenue. Urban Construction speed limit will vary at each location. Minimum lane closures during daytime hours are to be expected with little impact to travelers. I80B/US30B 102.36 to 106.48 Paved Various delay conditions Apr 08, 2019 02:58 pm
Buffalo Marginal, I-90/I-25 Interchange I902122 Isaac Finkle
620.0184
S & S Builders, LLC
Gillette, WY
307-686-5659
2019-Apr-01 2019-Oct-31 Grading, placing bases, concrete slab replacement and bridge rehabilitation on I-90 between mileposts 56.21 and 59.11. There is a 12 foot width restriction in place both directions. Expect single lane traffic with speed reductions. Exit Ramp Closures and Detours throughout the course of the project. I90 56.21 to 59.11 Paved Various delay conditions Apr 09, 2019 08:52 am
I-80 Point of Rocks West NHPPI-I802200 Peter Stinchcomb
307-352-3036
Kilgore Companies, LLC and Sub.
Magna, UT
801-250-0132
2019-Mar-25 2020-Oct-31 Minor reconstruction, bridge removal and replacement, rock scaling and resurfacing of the eastbound lane. Traffic control is in place. A width restriction of 16 feet is in effect throughout the project. Construction zone speed limit of 65 MPH. I80/US30 120 to 130.5 Paved Construction zone speed limit 65 MPH Apr 21, 2019 04:03 pm
Meeteetse - Pitchfork, West Wood River Section STP-1500018 Todd Frost
307-587-2220
todd.frost@wyo.gov
McGarvin-Moberly Construction Co.
Worland, WY
307-347-4268
2019-Apr-01 2019-Oct-31 Grading, placing base, bituminous pavement surfacing, chip seal and miscellaneous work on 5.20 miles on WYO 290 beginning at RM 6.06 between Meeteetse and Pitchfork. Expect one lane traffic with delays up to 20 minutes. WY290 6.06 to 11.39 Paved 20 minute delays Mar 27, 2019 10:31 am
Gillette Bridge Rehab B194024 Joshua Jundt
307-685-5931
josh.jundt@wyo.gov
S & S Builders, LLC
Gillette, WY
307-686-5659
2019-Apr-01 2019-Nov-30 Rehabilitation of the Garner Lake Road Overpass of I-90 at exit 129. Work will be performed one half at a time with single lane traffic north and south bound maintained. There is an 11' width restriction in place. I90/US14/US16 129 to 129 Paved Various delay conditions Apr 01, 2019 10:03 am
Highway 50 - Lakeway South Section 0300039 Joshua Jundt
307-685-5931
josh.jundt@wyo.gov
Simon Contractors and Subsidiaries
Cheyenne, WY
307-632-7900
2019-Apr-01 2020-Jun-30 econstruction of WY 50 between Lakeway Road and Southern Drive. Widening of the existing roadway to five lanes with the addition of storm drainage, curb, gutter, sidewalk and new traffic signals. Beginning April 1st, anticipate single lane closures with delays up to 15 minutes, primarily between Lakeway Road and Patriot Estates. A full road closure is tentatively scheduled for May 28th between Lakeway Road and the 4J/Force Rd intersection. The detour route will utilize Lakeway Road, Oakcrest and 4J. WY50 5.08 to 3.01 Paved 15 minute delays Apr 08, 2019 01:48 pm
WY50 5.08 to 3.01 Paved 15 minute delays Apr 08, 2019 01:48 pm
Kemmerer Hams Fork Road, Lake Naughton/City Dam Slides DR35696/DR34795 Jennifer Hoffman
307-877-3239
Wilson Bros. Construction, Inc.
Cowley, WY
307-548-6559
2019-May-01 2019-Oct-31 Landslide repair. Detour will be constructed at MP 12.5. Flaggers will maintain one-way traffic at MP 16.7. WY233 12.5 to 16.7 Paved Various delay conditions Apr 01, 2019 01:12 pm
Kemmerer Streets (US189) P112023 Jennifer Hoffman
307-877-3239
Lewis & Lewis Inc.
Rock Springs, WY
307-362-7948
2019-Mar-25 2019-Oct-31 Current construction activity is limited to bridge work at RM 37.3 - 37.5 where a 10' width restriction is in place. No loads over 10' are allowed through the work zone. Two way traffic without stopped conditions are in place until later in the year when paving will occur. US189 34.53 to 38.14 Paved Various delay conditions Apr 02, 2019 08:44 am
Dwyer Jct - Glendo (Cassa Interchange Section) NHPPII252158 Tim Rasnake
307-331-3144
tim.rasnake@wyo.gov
Oftedal Construction, Inc.
Casper, WY
307-237-4499
2019-Apr-01 2019-Oct-31 Grading, draining, milling, paving, bridge rehab, and other miscellaneous work. Traffic control is in place. I25/US26/US87 97.49 to 100.86 Paved Construction zone speed limit 65 MPH Apr 22, 2019 07:57 am
District Five Fence Repair (Worland) B195010 Jordan Erz

jordan. erz@wyo.gov
Kiewit Construction Co. & subsidiaries
Littleton, CO
303-979-9330
2019-Apr-01 2019-Aug-30 Fence repair between milepost 167.62 to 176.66 on US 20 near Worland. US16/US20/WY789 167.62 to 176.66 Paved Construction zone speed limit 45 MPH Apr 10, 2019 02:35 pm
Moorcroft - Sundance I-90 Moorcroft East I9004138 Preston Beckstead

Riverside Contracting, Inc.
Missoula, MT
406-721-9267
2019-May-01 2019-Jun-30 Grading, milling plant mix, placing crushed base, bituminous pavement surface, chip seal, structure repair and miscellaneous work. I90 155.1 to 160.31 Paved Various delay conditions Apr 11, 2019 07:37 am
Laramie - Rawlins (Rawlins marginal) NHPPI-I804258 Jake Lonn
307-328-4103
jake.lonn@wyo.gov
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2019-Apr-22 2019-Oct-31 Grading, grind/texture concrete, concrete slab replacement, sealing joints (concrete pavement), bridge rehabilitation and miscellaneous work on Westbound and Eastbound lanes between RM 210.98 and RM 216.22 I80/US30 210.98 to 216.22 Paved Various delay conditions Apr 24, 2019 01:47 pm
Lyman - Granger Jct (County Line West) I801182 Damon Newsome
307-789-3363
Lewis & Lewis Inc.
Rock Springs, WY
307-362-7948
2019-Apr-01 2021-Oct-31 Grading, milling, placing crushed base and bituminous pavement surfacing, plant mix wearing course, bridge rehab, and misc. work. I80 49.06 to 57.04 Paved Construction zone speed limit 45 MPH Apr 22, 2019 08:53 am
Montana State Line - Ranchester (Ranchester North) NHPPI-I901116 Jerry Buckley
674-2326
jerry.buckley@wyo.gov
Riverside Contracting, Inc.
Missoula, MT
406-721-9267
2019-Feb-01 2019-Oct-31 Grading, draining, milling, paving, bridge rehabilitation, and misc. work both directions. I90/US87 10.488 to 5 Paved Various delay conditions Apr 17, 2019 11:58 am
Fort Steele Section 1804260 Aaron Spenny
328-4104 or 321-6517
Kilgore Companies, LLC and Sub.
Magna, UT
801-250-0132
2019-Apr-18 2019-Oct-31 Grading, milling plant mix, placing various bases, bituminous pavement surfacing, plant mix wearing course, bridge rehabilitation and miscellaneous work on approximately 6.00 miles on both east and west bound lanes of I-80. Traffic will be head to head the EB lane and slowed down to 65 MPH. Traffic restricted to one lane during the day time and slowed down to 45 MPH where workers are present. I80/US287/US30 227.5 to 233.76 Paved Construction zone speed limit 65 MPH Apr 22, 2019 08:51 am
WY 230 No number at this time Steve Cook
307-760-2595
McGarvin-Moberly Construction Co.
Worland, WY
307-347-4268
2019-Apr-22 2019-Aug-01 Roadwork, resurfacing, and bridge rehabilitation on WY 230. There will be one lane of alternating traffic with 5 minute delays. Traffic control is in place. WY230 22 to 33 Paved Various delay conditions Apr 23, 2019 11:07 am