District 3 (Southwest) US191: 40,000 GVW Restriction in place between Rock Springs and the Utah state line from milepost 500 to 551. WY 22: NO TRAILERS until April 1, 2019 and weight limit of 60,000 GVW in effect between Wilson and the Idaho state line, over Teton Pass, from milepost 7 to 17. US189: Watch for wildlife between La Barge and Pinedale from milepost 105 to 131. 
District 4 (Northeast)  
District 5 (Northwest)  

Project Name Project Number WYDOT Contact Contractor Contact Start Date Completion Date Description Road Milepost(s) Surface Delays Last Updated
Snake River North N104083 Bob Hammond
307-732-9602
Wadsworth Brothers Construction Co.
Draper, UT
801-576-1453
2018-May-22 2019-Jun-30 Grading, draining, milling plant mix, removal and replacement of structures, concrete box culverts, placing crushed base and bituminous pavement surfacing, plant mix wearing course, electrical and sewer systems, and miscellaneous work. Paved road. Narrow road over the Snake River Bridge. No delays. US189/US191/US26/US89 144.99 to 148.7 Paved None Nov 15, 2018 08:43 am
Casper Streets (Poplar St. Bridge Over BNSF) (WY220) NHPP-N212118 Chad Aagard
473-3225
chad.aagard@wyo.gov
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2018-Mar-19 2019-Jun-30 Bridge Reconstruction on Poplar Street (WY220), just North of 1st Street, West of Downtown Casper. Traffic will be reduced to one lane in each direction(the two outer lanes across the bridge over the BNSF railroad tracks). Throughout this project, traffic from 1st Street north will remain reduced to one lane, either direction. This is likely to cause severe congestion. Alternate routes are suggested such as Salt Creek Highway. At this time traffic lanes will be 10 feet wide. WY220 116.5 to 116.5 Paved Construction zone speed limit 45 MPH
Various delay conditions
Mar 14, 2018 10:11 am
North Federal Boulevard (US26/WY789) 1 Robert Scheidemantel
307-856-1341
robert.scheidemantel@wyo.gov
S & S Builders, LLC
Gillette, WY
307-686-5659
2018-Mar-19 2019-Oct-31 Road work between Washington Ave. and Forest Drive on WY789 from MP 105.09 to 106.61. S&S Builders will close Washington Avenue on the East side of Federal Blvd on March 19th to remove asphalt and concrete. There is an 11 foot width restriction in place for all oversized loads. There is a speed reduction from 30 mph to 20 mph. Most of the travel lanes have been opened. Some work still ongoing with occasional lane closures for 1 day. Speed limit is still reduced through most of the project. WY789 105.09 to 106.61 Paved Reduced speeds up to 20 MPH
15 minute delays
Nov 26, 2018 03:04 pm
Lamont South N211060 Jack Stone
307-473-3227
jack.stone@wyo.gov
Knife River
Cheyenne, WY
307-634-5455
2018-May-29 2019-Jun-30 US287/789 between mileposts 22.97 & 32.99: Grading, draining, crushed base, plant mix overlay, chip seal, bridge rehabilitation, guardrail and miscellaneous work. Expect 20 minute delays. 12 foot width restriction is in place. US287/WY789 22.97 to 32.99 Paved 20 minute delays Jul 10, 2018 11:47 am
Lusk-Van Tassell (East Section) N403008 Jim Barnes
331-1535
james.barnes@wyo.gov
Knife River
Cheyenne, WY
307-634-5455
2018-Jun-04 2019-Oct-31 Grading, draining, milling, placing surfacing, bridge rehabilitation and bridge replacement, and miscellaneous work on approximately 8.5 miles of US 20 beginning at MP 54.80 between Lusk and Nebraska state line. Paving on the project is complete. There is a short detour at R.M. 61 for the bridge replacement with speeds reduced to 30 M.P.H. A 12' width restriction is in place at the detour location. US20 54.8 to 63.24 Paved, Dirt, Milled Construction zone speed limit 30 MPH
Various delay conditions
Nov 26, 2018 09:53 am
District 1 Bridge Rehab NHPPI-BR-B181011 Kory Cramer
307-745-2137
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2018-May-14 2019-Sep-30 Grading, milling plant mix, placing crushed base and bituminous pavement surfacing, concrete slab replacement, bridge rehabilitations and miscellaneous work at various locations in Transportation District 1 located on I-80 Eastbound and Westbound between mileposts 258.95 and 267.19. Traffic has been diverted onto the ramps at the Wagonhound interchange. No delays are expected I80 258.95 to 267.19 Paved None Oct 28, 2018 05:45 am
Blue Sky Highway WY 132 1 Erik Smith
307-332-4151
erik.smith@wyo.gov
High Country Construction, Inc.
Lander, WY
307-332-4933
2018-Jul-30 2019-Oct-31 Between intersection of US 287 and Ethete along Blue Sky HWY, WY 132, shoulder grading, truck, and heavy equipment traffic along shoulders of highway. Minor traffic delays and areas of reduced speeds. Paved surface. WY132 0 to 7 Paved Various delay conditions Nov 07, 2018 01:37 pm
Cody - Montana, Cody North 1502014 Todd Frost
307-587-2220
todd.frost@wyo.gov
Riverside Contracting, Inc. - Billings
Billings, MT
406-256-0555
2018-Sep-24 2019-Jun-30 Grading, placing pit run and crushed bases, bituminous pavement surfacing, chip seal and miscellaneous work, on approximately 8 miles of WYO 120 beginning at RM 101.51 and proceeding north to 109.10. WY120 101.51 to 109.1 Paved, Gravel, Milled None Nov 21, 2018 10:12 am
WY 32 MP 100-113 1 Michael Miller1
431-2765
michael.miller1@wyo.gov
  2018-Nov-01 2019-Jan-01 Fencing project WY32 100 to 113 Paved None Nov 15, 2018 05:52 pm
US 310/789 mp 238-242 US 310/789 mp 238-242 Michael Miller1
431-2765
michael.miller1@wyo.gov
S & S Builders, LLC
Gillette, WY
307-686-5659
2018-Nov-11 2019-Jan-01 Highway paving and rebuilding fence - Call Mike Miller (WYDOT contact) if cows get out US310/WY789 238 to 242 Paved None Nov 15, 2018 05:59 pm
Kemmerer - Cokeville, US 30 Landslide DR34586 Jennifer Hoffman
307-679-4811
jennifer.hoffman@wyo.gov
Wilson Bros. Construction, Inc.
Cowley, WY
307-548-6559
2018-Dec-03 2019-Jun-30 Landslide repair. Minor delays, most of the work is done on the shoulder. US30 46 to 47 Paved Various delay conditions Dec 04, 2018 04:11 pm
Casper Traffic Signals N212120 Jack Stone
307-473-3227
jack.stone@wyo.gov
Reiman Corp. and Subsidiary
Cheyenne, WY
307-632-8971
2018-Nov-26 2019-Aug-31 Grading, milling concrete, placing crushed base and bituminus pavement surfacing, plant mix wearing course, removal and replacement of sidewalk, curb and gutter, electrical and miscellaneous work. Individual intersections include Poplar St & Collins Dr and WY Blvd (258) and 13th St. Intermittent daytime lane closures thru winter months. Full construction activities begin in spring. WY220 115.76 to 115.76 Paved None Dec 09, 2018 08:38 am
WY258 8.86 to 8.86 Paved None Dec 09, 2018 08:38 am